11
Comments
  • 2
    I'm always the one that does 99% of the work, because my team mates are useless.
  • 1
    Last time someone posted this pic I said that I'm both of the left guys simultaneously, however with my current group project I also have to add being the guy on the right to the mix
  • 1
    This picture didn't mention the guy who always wants to 'manage' this in the group project.. Who basically is just trying to avoid work
  • 1
    Relatable. I've been that guy doing 99% work in all group projects I've been part of but if i were to be in group work with other guys "who does 99% work", I'd probably be guy at the right end.
Add Comment