Join devRant
Do all the things like
++ or -- rants, post your own rants, comment on others' rants and build your customized dev avatar
Sign Up
Pipeless API
From the creators of devRant, Pipeless lets you power real-time personalized recommendations and activity feeds using a simple API
Learn More
Search - "sucky boss"
-
Wow this one deserves a rant. Where should I even begin? I got a new job for over half a year now doing work in an agency. We're building websites and online shops with Typo3 and Shopware (not my dream, but hey). All fine you might think BUT...
1) I have been working on the BIGGEST project we have all by myself since I started working at this company. No help, nobody cares.
2) If something goes wrong all the shit falls back to me like "wHy DiDnT yoU WoRk MoRE?". Seriously? How should one dev cover a project that's meant for at least two or three.
3) The project was planned four years ago (YES that's a big fat FOUR) and sat there for 3,5 years - nobody gave a fuck. I got into the company and immediately got the sucky shit project to work on.
4) I was promised some time to get familiar with the projects and tech we use and "pick something I like most to get started". Well that never happened.
5) I was also promised not to talk directly to our customers. Well, each week I was bombarded with insults, a shitload of work and nonsense by our customers because (you guessed it) I was obligated to attend meetings.
6) The scheduled time for a meeting was 30 minutes, sometimes they just went on for over two hours. Fml.
7) Project management. It does not exist. The company is just out to get more and more clients, hires more god damn managers and shit and completely neglects that we might need more devs to get all this crap finished. Nope, they don't care. By the way: this is not like a 200 employee company, it's more like 15 which makes it even sadder to have 4 managers and 3 devs.
8) We don't use trello (or anything to keep track of our "progress"), nobody knows the exact scope of the project, because it was planned FOUR FUCKING YEARS AGO.
9) They planned to use 3 months on this project to get it finished (by the way it's not just an online shop, it has a really sophisticated product configurator with like 20 dependencies). Well, we're double over that time period and it is still not finished.
10) FUCK YOU SHOPWARE
11) The clients are super unsatisfied with our service (who would have guessed). They never received official documents from us (that's why nobody knows the scope), nor did they receive the actual screen design of the shop so we just have to make it up on the go. Of course I mean "I" by "we", because appearently it is my job to develop, design and manage this shit show.
12) My boss regularly throws me in front of the bus by randomly joining meetings with my client telling them the complete opposite of things that we discussed internally (he doesn't know anything about this stupid project)
13) FUCK YOU COLLEAGUES, FUCK YOU COMPANY, FUCK YOU SHOPWARE AND FUCK YOU STUPID CUSTOMERS.
14) Oh btw. the salary sucks ass, it's barely a couple of bucks above minimum wage. Don't ask me why I accepted the offer. I guess it was better than nothing in the meantime.
Boy that feels good. I needed that rant. But hey don't get me wrong. I get that dev jobs can be hard and sucky, but this is beyond stupidity that I can bear. I therefore applied for a dev job in research at a university in my dream country. Nice colleagues, interesting projects, good project management. They accepted me, gave me a good offer and I can happily say that in 6-7 weeks my current company can go fuck themselves (nobody knows the 10.000+ lines of code but me). Just light it up and watch it burn!20 -
"We have another major incident spinning up. QueenMorgana, are you free?" NO, I'M FINISHING UP THE NOTES FROM MY LAST TWO CALLS THAT JUST ENDED, WHY DON'T YOU CALL IN, LAZY FUCKWAD.
Why is it so damn difficult for my boss to cover a call when we're all busy DOING ALL THE LITTLE POINTLESS SHIT HE GIVES UP. He had me follow up from my coworker's call yesterday, not seeing the logic in, IF IT WERE STILL A FUCKING ISSUE, THEY WOULD HAVE CALLED US BACK THIS MORNING.
So now, I have to sit on the line AGAIN and take notes for shit that's not even a major issue BECAUSE IT'S BEEN DOWN FOR A WEEK. IF IT'S DOWN THAT LONG AND YOU DON'T SUBMIT A TICKET TO ME OR CALL OUR MAJOR INCIDENT LINE, I DON'T GET PAID ENOUGH TO RESPOND LIKE IT'S AN EMERGENCY.
Also, fucking lazy asswipe of a "teammate" bitching about being on a call for over 8 hours, while the rest of us are on back to back calls. He's never been on a long call and has been here a year longer than I have. I've been on a 14 hour and a 16 hour, and my other teammate has handled a 26 hour call. 8 HOURS IS FUCKING NOTHING AND YOU WORK FROM HOME SO DON'T EVEN HAVE TO WEAR PANTS.
**spilled 3 cups of coffee this morning, and have an expensive maintenance on my car today, likely to explode on just about everyone**24 -
I have got a new director at work. My previous director had to retire already, the man was already feeling it and he had been on the institution for more than 35 years....I am 30, so this tells you how much the man has been there.
This new dude.....has the presence of a Caterprie (Pokemon) or an Oompa Loompa. In contrast, the previous director felt like a 4 star General (never been in the presence of a 5 star since those occurrences are world war rare) but I had respected that man so much and loved working with him. I really did loved my boss, he was stern and professional, but kind and friendly to his staff, fiercely protective, no one took advantage of I.T while he was there, he would literally fight for us and took our word before anything else. The man was, well, a true man. A true leader.
He took a chance in putting me as the head of my department, but he had faith in me, and coached me and trained me as much as he could. Had the requirement for his position not been a masters he himself told me that he would have loved to make me his successor, even when I would constantly tell him that I was scared shitless of the work he did and the amount of things he did for the institution, to me this is a very laaaaaaaaarge cowboy hat to fill (this is Texas, he wore a hat, the saying is normally "shoes to fill", but fuck it)
This new guys looks away when the other managers are speaking to him. He constantly interrupts us. He constantly tells us about how the other institution in which he was (rival might I add) does X or Y, its fucking annoying to the point that me and the other managers have a drinking game, for every time he references his old institution we drink one beer over the weekend. It is Saturday night and I am 36 in in total (this is my favorite part of it tho) and it is just annoying.
His train of thought makes no sense to me:
"This application, where did you buy it? we tried purchasing one on Y when I was still there but found none"
Me: "Well, since it was a new government mandate and had nowhere to go we had to develop it in house"
Him: "We had tried to purchase what you guys had but found no place that sold it, so why didn't you try purchasing it?"
Me:.....well, because it was brand new, purchase it from where? We also don't like dealing with vendors that manage these sorts of things because every new requirement takes them weeks to produce on very high budgets, historically, my department has only had maintenance fees for the software that we have and even those applications crap themselves all the time and they take weeks to answer back to us.
Him: So you decided to develop it in house instead? we would never do that! back at y we purchased everything our engineers never really developed anything!
Me: Well then, what is the purpose of having engineers if they are not going to actually develop an application?
Him: IF there is something out there that is better then why should you reinvent the wheel?
Me: For this one I did not reinvent the wheel, I am not talking about creating a programming language from scratch, but how does custom solutions that specifically feed the needs of the institution to be produced otherwise? The department has developers for a reason, because they have very specific needs in here that can only come from a team of developers that are in house satisfying those needs.
Him: Well our engineers never had to do that. Sure projects sometimes had to put on holds because the vendor was busy, but such is the nature of development
Me: No it is not, the nature of development is to create things, it is one thing for my team to go through bugs and software considerations, it is another for me to not provide a service because some random company is taking two weeks on a $300 dllr an hour contract to put a simple checkbox on a form. If a project fails the board is not going to care that some vendor is not doing their job, they are just going to blame me, if that is the case then I would much rather the blame be actually mine than some sucky third party "developer" also, your engineers where not even engineers, they were people with a degree that purchased things, that's it, please do not compare them to my guys or refer them as engineers in front of me, they are not.
Him: Well, maybe.
MAYBE?!! motherfucker I did not kill myself learning the ins and outs of architecture and software engineering on my own time after my fucking bachelors in C.S for your codeless background ass to tell me MAYBE. My word IS the fucking WORD here, not yours. Fuck me I really dislike this dude's management practices.
The shitty part? He is not a bad person, he is not a bad dude that is out to get us, just a simple minded moron with no place as a leader.
I know leaders, I know what a leader is, this is not one.10