Search - "project estimation"
-
So I used to do some freelancing in web development last year, nothing too fancy just some simple PHP websites. Comes the worst meeting in my life. So I am from India and we have a lot of long lasting business here being passed on over generations. TL;DR the guy was the owner of a very old business which was actually very huge and the guy was educated too, so I assumed that he'll be sensible as compared to other people.
The meeting was in an expensive cafe and he paid for it, he even told me upfront that meeting is on him. Great, right? So we sit down, order some coffee and then start discussing what he needed.
The guy needed an ecommerce website built with backend and logistics system integrated. We discussed possible designs for the website and stuff too and so far the deal looked promising to both of us.
I explained him the cost estimate and told him that I would email him the final quote from myself once we discussed server cost and shit.
So now comes the bargaining part where he asked me to give him server and domain for free.
At this point, I suspected that he didn't know that servers and domains are not something that you make. You have to purchase and renew them periodically.
So I told that guy that he didn't understand the cost estimation and explained to him that X is the cost of making this fucking thing and Y is its monthly maintenance cost, if he wanted annually could be done too. And this Y did not include server and domain costing.
Now came the fucking tide, the guy straight up turned to his shit and told me I am lying and trying to con him. So I gently asked him if he had ever gotten any website made. To which, he said No, but he knows how the costing works.
I was like "Bitch?". So I calmly tried to explain that that's not how websites are done, delivered and maintained.
He didn't seemed to be understanding and kept on fucking repeating that he knows his shit and blah blah.
At this point, I was like "Okay. Fuck this dude then. I can find another project. " and then I told him that he'll need to find someone according to his needs.
Interestingly enough, the guy called someone and then walked out of the cafe while talking on phone. I waited for 5 minutes and he didn't come back so I decided I would pay for my coffee and leave. Turns out the guy had paid his bill before my arrival and ditched me with the excuse of the call.
But oh well, I think working with such an idiot would have been much worse than paying for that coffee.4 -
The 5 stages of project management:
1 - the Mission:
Receive a project
2 - the Vision:
Over confidence and optimistic time estimation. Tell people how quick you can finish it.
3 - the Climax:
Adding unnecessary features. Try to be innovative. Think different. Feeling like a Rockstar.
4 - the Bargain:
Does not aware deadline is not far away. Reverse all unnecessary or impractical moomshot features. A bit stressed
5 - the Embarrassment:
Unpredicted obstacles or incidents. Late delivery or fail. Feel like a loser.1 -
Thank goodness I put on my adulting cap and had a talk with my project manager today. He's such a kind and understanding person, truly underestimated qualities.
I'm basically a sub-contractor; a freelance consultant who get jobs from another company (ie my PM) and I messed up the estimate for this project we're working on and I did so in a rather spectacular manner.
60-80 estimated hours are now in the 300:s... I've missed more deadlines in this project alone than I have done in all my career (+10 years) combined. It's bad. It's a complete clusterfuck.
Problem is because of this never-ending project I haven't been able to work on things I can debit since May and I didn't have those margins. I'm fucked financially and I've been so stressed out about that I've literally been loosing sleep over it, found myself ugly-crying in the middle of the night more than once, worrying about how the fuck I'm gonna get on.
In my mind it was a real thing that they wouldn't want to keep working with me after this. Even though the failures in this project isn't _only_ on me, I'm not one to make excuses for myself and I would completely understand if that had been the outcome.
But it wasn't.
Instead he just said he was sorry he wouldn't be able to get all my hours billed by the client (of course not; we've left an estimate and by at least Swedish business law you can't deviate from those simply because you made an incorrect estimation).
But he has no intentions of letting me go as a consultant and assured me there will be other jobs (planned since before this whole ordeal). He's even going to try and get some hours in for me in other projects, small things here and there so I can get some billable hours quickly to help me out.
He knows me and he knows this isn't who I am as a professional. I'm so relieved I could god damn cry.3 -
Boss : Did you finish the service app?
Me: Nope, sir you told us to complete the immediate relief website.
Boss: Ok. Did u complete that?
Me: Nope, when it was half you told us to complete the clients web app?
Boss: Oh god. So is that over?
Me: Unfortunately, no sir a month more and we can present the project estimation report if we are free😁😉2 -
I'm on my first free lance project, and devRant asks me for my horror story. -_-
Well, I undersold myself and gave such a stupid time estimation. Fortunately, the client was smarter, and he wants just half the work in same time period and will still gave me the same amount xD1 -
There was a sales manager who was raked with overseeing me and another dev finish a last minute request project. He said at one point to the other dev that he was mad at developers because we understood something that he would never understand.
This same manager would often sit in on estimation meetings and constantly say that we were estimating too high and needed to come up with faster solutions. When we would offer him with caveats of possible technical debt or unintended side-effects/performance issues, he'd want us to go with that solution. He would then complain that we were always wanting to work on technical debt and that our application was slow. He would also ask for very high level estimates for large, unscoped features/apps without any meaningful level of detail, then hold us to the high-level estimated date even after revealing additional features previously unmentioned.
We learned to never compromise on the right solution and to push back hard on dates without proper scoping. They didn't learn, so I and most of the good devs left. -
So, 9months ago my scrum master came to me and asked me to spearhead a "little" API... 2months work, no worries... I started the analysis and quickly discovered that that estimation was grossly understimated...
I convinced them that it was not 3 months but 4. I alerted to the design mistakes that were made, I pushed changes and made sure the entire project worked, was stable and the best it could be... 4 months passed, target proposition donne... Several change requests since then and we have been implementing braindead CR after CR for 5 months... Most CRs came from design issued I raised but we're ignored at the time just to come back and bite them on the ass...
Horrible design, bad documentation, amateur requirements analysis... However, delivered successfully with great acceptance...
What was my reward? They rearranged my team, removing virtually every good performer.
Never did I receive a "good work" or a "thank you"... I don't want one, I am just doing my job... However can you please not fuck me in the ass!? I now have 2 projects to spearhead at the same time and virtually no team... I can only handle so much!!!
Some good news? Ok, just announced I'm the project owner of a new project, that we will take advantage and make a 2 in one.... Great! Some more work for my lap! Thank you for the workload raise!... Ok, timewise? One month! And I still don't if that includes implementation....
TL DR; did my job, got fucked with more work...
Sorry for the vent, just wandering if I should try and not do my job...2 -
Hardest thing about software development to me is estimation of time needed to complete. There should be an algorithm that knows to estimate better than me, shouldn't it? Like google maps navigation knows precisely in advance when I will arrive somewhere taking a car or a train, perhaps they could do my development estimates for me?9
-
My first project it’s an emotional roller coaster. I was a little trainee/ junior dev at my job with a little more than a month learning RoR and one day my tech lead receives an email from the big boss saying: “We got a big client who wants a total redesign of his web and we said yes we can do it in a month, so please check if anything it’s reusable”, after reading my tech lead said to me “Do you want to help me with this ?” And well, we spend like 2-3 hours checking all the controllers, views, assets, etc. We conclude that the project was mostly front end changes and the back end will stay the same, so yeah it can be done in a month. The next day in a meeting with all the team I was nominee to be the person in charge of that project, because it was an easy project and all my teammates hate to do front end stuff, so I take the challenge. After that I met the Project Manager, another guy who recently start as PM about a month, so yeah we were two new guys who need to handle the project of a big client, nothing can go wrong. We did the planing, I give an estimation ( first one in my life ) for the tasks and added like 4 hours in case anything goes wrong. Then the first sprint came by, and I couldn’t finish it because the time given to some features was to low and the “design” was a mockup made by the PM, ok, no problems, we add more time to the tasks and we ask for a real design. At the half of the sprint the client start adding more and more stuff, the PM doesn’t talk back, just say yes yes yes. Then in a blink of an eye the easy project became a three months projects with no design at all, two devs ( a new guy who recently begin as dev enter the project ), just mockups and good hopes. But somehow we did it, we finish it! Nope. The early Monday of the next week I received an email of the PM saying we would have a second version and the estimation of the tech lead was a minimum of six months ( that became 8 months). This time was hell, because the client doesn’t decide what the hell he wants so a task would take a couple of days more or so, the PM became the personal bitch of the client, but it wasn’t his fault, because we later knew that the company became partner with this client and because of that the PM didn’t have too much choice :/, the designs were cool, but they weren’t on time ever, our only design guy had to do designs to our project and another 5 projects of the company, so yeah, we weren’t the only ones suffering. At the end we survive, the project was done and the client somehow was happy. Of course the project didn’t end and it was terminated half a year later, but I’ll always remember it because thanks to this project I was given the opportunity to work as a Front end dev and I’m happy still working as one.
-
I am a senior Android dev, and I have an old colleague (iOS senior dev). We work on the same project, but in every estimation session he pushes a lot on the lower side: he estimates 4h a task that normally takes 6h or 8h, and the reason is that he has no social life. Right after work he starts working again from home (I can see all his commits), he also works almost entire weekends. I would say he works as average 12/13 h per day.
I don t want to work extra time (unpayed).
About him, it is his life, so I don t care...but at the same time this makes me pressure. I care a lot about quality of code, and I don t want to sacrifice it just for catching up. Most of the people in the team know that he works a lot extra time.
How would you handle this?28 -
P L E A S E
Do not just teach them on how to program. Teach them on how to properly write a documentation and how to properly execute a project. Like, don't start coding directly. Teach how to plan a project properly especially on estimation. (lol)4 -
MENTORS - MY STORY (Part III)
The next mentor is my former boss in the previous company I worked.
3.- Manager DJ.
Soon after I joined the company, Manager E.A. left and it was crushing. The next in line joined as a temporal replacement; he was no good.
Like a year later, they hired Manager DJ, a bit older than EA, huge experience with international companies and a a very smart person.
His most valuable characteristic? His ability to listen. He would let you speak and explain everything and he would be there, listening and learning from you.
That humility was impressive for me, because this guy had a lot of experience, yes, but he understood that he was the new guy and he needed to learn what was the current scenario before he could twist anything. Impressive.
We bonded because I was technical lead of one of the dev teams, and he trusted me which I value a lot. He'd ask me my opinion from time to time regarding important decisions. Even if he wouldn't take my advice, he valued the opinion of the developers and that made me trust him a lot.
From him I learned that, no matter how much experience you have in one field, you can always learn from others and if you're new, the best you can do is sit silently and listen, waiting for your moment to step up when necessary, and that could take weeks or months.
The other thing I learned from him was courage.
See, we were a company A formed of the join of three other companies (a, b, c) and we were part of a major group of companies (P)
(a, b and c) used the enterprise system we developed, but internally the system was a bit chaotic, lots of bad practices and very unstable. But it was like that because those were the rules set by company P.
DJ talked to me
- DJ: Hey, what do you think we should do to fix all the problems we have?
- Me: Well, if it were up to me, we'd apply a complete refactoring of the system. Re-engineering the core and reconstruct all modules using a modular structure. It's A LOT of work, A LOT, but it'd be the way.
- DJ: ...
- DJ: What about the guidelines of P?
- Me: Those guidelines are obsolete, and we'd probably go against them. I know it's crazy but you asked me.
Some time later, we talked about it again, and again, and again until one day.
- DJ: Let's do it. Take these 4 developers with you, I rented other office away from here so nobody will bother you with anything else, this will be a semi-secret project. Present me a methodology plan, and a rough estimation. Let's work with weekly advances, and if in three months we have something good, we continue that road, tear everything apart and implement the solution you guys develop.
- Me: Really? That's impressive! What about P?
- DJ: I'll handle them.
The guy would battle to defend us and our work. And we were extremely motivated. We did revolutionize the development processes we had. We reconstructed the entire system and the results were excellent.
I left the company when we were in the last quarter of the development but I'm proud because they're still using our solution and even P took our approach.
Having the courage of going against everyone in order to do the right thing and to do things right was an impressive demonstration of self confidence, intelligence and balls.
DJ and I talk every now and then. I appreciate him a lot.
Thank you DJ for your lessons and your trust.
Part I:
https://devrant.com/rants/1483428/...
Part II:
https://devrant.com/rants/1483875/...1 -
Manager: These estimates are wrong
Me: Why?
M: These shouldn't take too long
Me: Well you asked me to make those while I was busy with the mess design did.
Jr frontend: Manager is right. They shouldn't take too long.
*me knowing jr doesn't know the system nor coding standards*
Jr: I'll fix mine to get a more accurate estimation. Do you want me to do yours?
* Me thinking f*ck no*
Me: Just do yours.
M: Ok. Then we are settled.
He just wanted me to fit a 10 week project into 6 weeks while I carry the Jr and was complaining I didnt do it well.
Fml5 -
feel stupid bcoz you underestimated the time to complete the project, feel even more stupid when you do it again and again1
-
During my time at university my friend got me a job, he said. He explained there was someone who was a member of some student club where they needed a website. Me and this person met and discussed the scope of the project, "nothing major but it will take some time" I thought to myself.
I gave her a rough estimation and told her my rate (extremely cheap). She looked at me and said "I was thinking a case of beer would be enough?".
We were both students, but seriously?? I almost contacted a proper company to give them the details just to get a real cost estimation to shove it in her snug fucking face! -
Had a project estimation meeting with my manager yesterday. I told him that it will take minimum 3 months to complete the project, and he finally settled for 15 days.
Why do we have these bullshit meetings at the first place? -
When freelancing, do you charge for estimations?
Situation is that I'm a sole android developer (4 years experience) and each time I encounter some agency or a client I feel like I'm between a rock and hard place.
Some of the clients come with ready with list of requirements and ready backend/design sketch and they want me to give them a rough estimate.
It's as if they expect me to take only 2-3 hours for estimation and that's it. But actually this was the second time where I had to spend around 10 hours investigating everything so I would be able to give a half decent estimation at least.
This particular client's project turned out to be a mess and I had to spend 10+ hours to estimate only 70% of his project. I asked him if he would be able to pay under a reduced tarrif and the client was shocked, started doubting my competence level and so on.
In the end I gave him a rough 400 hours estimate and he started complaining that others estimated only 200 hours for his project. So in the end I just wasted my time.
Now it's my bad that I voluntarely invested too much time in this estimate without notifying client prior that I might ask to pay for estimation, next time I will try to do this ahead of time.
It feels like only big agencies who have free resources have a competetive edge against sole freelancers, it really sucks wasting so much time to estimate half baked requirements and assets. Also most of these clients and agencies are purely lazy and most of the time they don't even plan signing, all they need is someone to estimate their work for them.
I'm thinking of starting to charge for estimations and communications in a form of consultations. Is that a good idea?8 -
Good Morning Folks!!!
I haven't been posting in a while, besides the fact that I went thru a crazy psychiatric crisis 6 weeks ago, there have not been much news to share here.
Now, recovering and working again luckily, I have to face again the stupid pointy haired boss.
So, this fucker asked me for an estimation to build a simple web app.
He: Hey, can you make an estimation for this app
Me: sure, here it is.
He: *to the client*, here's the estimation for the web app you requested
Client: Uhmm, can I haz desktop for winbug$??
He: Let me check with dev
Me: Sure why not, we can do F# using MVU which is basically the same as using modern web frameworks
He: Sure, I'll tell that to the client.
Client: Oooohhh, C#, we lovez C#, can I haz discount?
He: Client wants discount to make it in C#.
Me: Oh, you can give him a discount to make it in F#, I never said C#
He: But your cv says you used C# ten years ago.
Me: Sure, but is not keeping up with functional design patterns, which is what I do.
He: Ok, so I'm offering him the discount in F#
Me: Great.
He: So, project is approved, thanks for the discount, you have 3 weeks to present the product in C#.
Me: Sure, I'll start when I get the downpayment.
Me: I'm considering saying that I didn't understand that he wanted it in C#, and just do F# and not let him know until the project is done.
Thoughts??8 -
Customer calls
Talking about some new feature he haven't totally thought about. so i tell him to think about it.
Talking about a bug, but can't reproduce it.
Talking about another enormous new feature but halt it after hearing the initial estimation.
Total time waster = 1.5 hours for every day.
DON'T LET CUSTOMERS WASTE YOUR DEVELOPMENT TIME.
instead of talking - use project tracking software (i.e. JIRA) -
Hey guys. I am in a situation where I need to decide wether to take on a new project or not. And if not, how to turn down that client so that I would not burn any bridges. So I need your opinions on this matter in order to make the final decision.
To make things clear heres some background info. 10 months ago I quitted my fulltime position in another EU country and went back to my own home country. 10 months forward till today and I have my own ltd company which currently has 5 projects. Its doing pretty well money wise. All projects combined, I already earn more then I ever did and I need to work max 10 hours a week since all projects are remote projects so I dont waste time on useless meetings and etc. However I dont feel fulfilled or challenged anymore because surprise surprise doing well paid projects doesnt guarante your sense of fulfillment.
So I noticed that I have lots of spare time which I spend diving into rabbitholes with hobby projects. I decided that its time to scale my company and take on more projects and maybe even hire more people.
So I started searching for other projects I could work on (prefferibly remote projects or flexible ones where I could come in 2-3 days a week in office and work remotely rest of the week). Reason being that I am already out of sync with fulltime position lifestyle and I am totally result oriented, not punch in my hours and go home oriented.
For exampleIf i get my weekly tasks I prefer to do them in 1-2 days (even if it requires doing double shifts which rarely but happens) but then I want to have rest of the week off. Thats how my brain works and thats how Im wired. I cant stand fulltime positions especially in enterprise bigger companies where I come in and do maybe 2 hours of actual work everyday because of all useless meetings and blockers from backend/etc. Its soul crushing to me.
So I posted linkedin ads and started searching for new clients/projects. One month ago I went to an interview for an android project in a startup.
The project looked interesting enough. Main task was to rewrite their android app from java to kotlin. Apparently their current current app was built by a backend developer who wants to focus solely on backend.
So during the interview they showed me their app which was quite simple frontend wise but not so simple backend wise from what I was able to figure out.
Their project lead (also a backed guy) asked me my estimation of price and completion of task. I told them maybe 2-3 months to do everything properly.
Project lead was basically shocked because all other candidates told him they can rewrite the app from java to kotlin in 2-3 weeks. I told him that everything is possible but his app quality will suffer and for a better estimation he would we would need to sign an NDA so I could evaluate the costs. So we ended the interview.
After that we kept in touch for one month (it took them one month to google a generic NDA and sign it digitally with me).
So heres the redflags I noticed:
1. They dont respect my time. Wasted 1 month of my time and after signing NDA gave me 2days to estimate their project and go to a meeting and give them detailed info about what I can offer. I thats not a brain rape then I dont know what it is
2. They are changing initial conditions we talked about. We agreed on rewriting the codebase and be done with it. Now they prefer a fulltime worker who would be responsible for android app as his own product. So basically project lead was not able to find a fulltime dev so now hes trying to convert me (a company owner) to his fulltime worker.
3. Lack of respect. During the interview he started speaking in his own native language to me with some expression (he seemed pissed off at that moment when he switched languages).
4. Bad culture fit. As I said Im used to relaxed clients and projects where I dont need to be chained to a desk a monitored and be micromanaged. I mean lets sign a contract give me access to your codebase and tell me what to do, I will produce results and lets be done with it.
5. Project lead is a backend guy who doesnt understand how complicated android apps can be. No architecture and no unit tests are in his frontend app. He doesnt care about writing proper app since he ships it in his own device so he doesnt need to worry about supporting custom devices or different api levels of android and etc. But not having any architecture? Cmon.
So basically I am confused. Project lead needs a fulltime dev but hes in contact with me in hopes that I would sign a fulltime contract. But how I can work fulltime if all what I can see are redflags?
Basicaly I thinkthis was a misundersanding. Im searching for fulltime remote projects and hes offering fulltime inhouse projects. Project lead never outsourced so hes confused as well.
As you can see decision is already basically made to turn him down, I just need to know how to tell him to fck off in the most polite manner and thats it.6 -
PM asked me estimation hours for medium scale project, which can last for a year, most probably more. Any suggestions? :p3
-
So I'm going to have to give an estimate for how long this new project is going to take. It's about time I learn how to properly estimate projects. Or does the learning only happen with more experience? 🤔3
-
Newton's first law integrated into work estimation:
For every simple task there is a complex solution which devs will choose and it will take an infinite amount of time, unless acted upon by an unbalanced force.
where "unbalanced_force" belongs to the set union of ["managers", "POs"] and "anyone else who doesn't even work on that project".1 -
Well I'm back on this stupid project with this stupid Product Owner and I really hate this, it really demotivates me.
I was assigned to this project (data analytics) for like 6 months, working alone with this stupid PO that knows nothing about team management or project management.
The guy had a "methodology" where he established all task to be done daily and would not tell me what we have to do in the entire project but instead would tell me day by day all the tasks to be done in each day. This means that HE was the one making the time estimation which is plain wrong!.
Anyways, I talked to him and told him that I need to have a wide overview of the project in order to be able to make a good time estimation, and it kind of worked.
But the guy is a pain in the ass, calls me every 4 hours to "talk" about the project and texts me every hour to check "how are we doing?".
This project was killing me, I had no motivation to work on it, I hated every minute of it, I didn't like it at all to the point my boss (not him) talked to me and asked me what was wrong with me. I told him: This is not the project for me. He told me: Ok let's try to move you to another project.
After six months of agony, the project was stale (customer approval, paperwork, blah, blah) I was assigned to two other projects that I liked, more software architecture and development, not data analytics.
And last week my boss came back to me with "well, the project was approved so we need you back at it".
WHAT PART OF I'M NOT THE RIGHT GUY FOR THIS PROJECT DIDN'T YOU GET?
Now I'm again with this dude, calling me, texting me, sending me infinite emails, asking for minutely updates...
I really don't want to be working on this project. -
Ugh, I finally got a big project at work as the main backender but I still have a lot to learn. I fucked up the estimation for a big component and this is the fifth night im working late because I feel responsible.
Fuck this shit.4